Warning: Undefined property: AIOSEO\Plugin\Common\Models\Post::$schema in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 212

Warning: Attempt to read property "graphs" on null in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 212

Warning: foreach() argument must be of type array|object, null given in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 214

Warning: Undefined property: AIOSEO\Plugin\Common\Models\Post::$schema in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 250

Warning: Attempt to read property "customGraphs" on null in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 250

Warning: foreach() argument must be of type array|object, null given in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 251

Warning: Undefined property: AIOSEO\Plugin\Common\Models\Post::$schema in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 270

Warning: Attempt to read property "default" on null in /home/u980551470/domains/redrock.propelcomms.com/public_html/wp-content/plugins/all-in-one-seo-pack-pro/app/Pro/Schema/Schema.php on line 270

Jiggers Bank

Ground movements to the historic retaining wall supporting a road section north of Ironbridge led to its partial closure for many years. Investigations revealed a complex history to wall construction and challenging landslip ground conditions. Cost pressures excluded the rebuilding of the wall. Stabilisation design by Red Rock and subsequent construction works included the application of a geopolymer to infill voids in unstable arches hidden at the base of the wall and the requirements for a staged constructed methodology to minimise temporary works. The wall is being stabilised with 8-10m soil nails with a new facing of shotcrete and mesh reinforcement.

Latest from Red Rock:

Jiggers Bank

Stabilising Ironbridge’s historic retaining wall: Red Rock’s innovative design tackles hidden voids, landslip ground and cost pressures with soil nails,

Read More »

Deep Dive

Red Rock is proud to be geotechnical advisor for the new national underwater centre, delivering rockfall risk assessments, remedial solutions,

Read More »

Padstow RNLI

Red Rock Geo supported the RNLI at Padstow lifeboat station with ground investigations, assessing rock mass quality via rotary cored

Read More »

Tintagel Castle

After delivering the iconic Tintagel Castle footbridge, Red Rock is monitoring cliff stability and bridge abutments with lidar, photogrammetry, and

Read More »